TechnologyElectromagnetic catapult
ScopeAdjacent
EnergyNot published
Endurance disclosureNot applicable
Dated events20 · 2004 to 2026
EvidenceHigh confidencereviewed 2026-09-25

An August 2026 memorandum requests a CVN-81 conversion plan. Continued sustainment procurement supports existing systems and doesn't settle that ship design decision. Public cycle counts aren't evidence of railgun rail life.

Lakehurst, New JerseyLocality-level placement from the stated site · 40.03, -74.35

Dated record on a timeline

2005201020152020202520302004-04-05: General Atomics selected for EMALS SDD2008-09-03: Phase-one high-cycle testing reaches 10,0002009-03-19: Second high-cycle test phase reported underway2009-11-12: Lakehurst full-scale demonstration ceremony2010-12-18: First EMALS aircraft launch2011-05-09: First Ford components delivered2011-06-01: First T-45C launch2011-11-18: First F-35C EMALS launch2015-06-05: First Ford shipboard deadload tests2017-07-24: External-tank launch software fix validated2017-07-28: First aircraft launch from Ford at sea2021-07-12: Kennedy and Enterprise delivery progress disclosed2022-06-25: Ford reaches 10,000 launches and recoveries2023-06-07: Doris Miller launch/recovery production contracted2023-06-08: Enterprise production reported near completion2024-01-17: Ford returns from eight-month deployment2024-02-14: Kennedy first shipboard deadload launch tests2026-08-13: Presidential memorandum directs CVN-81 conversion planning2026-09-23: Continued EMALS procurement reported2032: Original CVN-81 support horizon2005201020152020202520302004-04-05: General Atomics selected for EMALS SDD2008-09-03: Phase-one high-cycle testing reaches 10,0002009-03-19: Second high-cycle test phase reported underway2009-11-12: Lakehurst full-scale demonstration ceremony2010-12-18: First EMALS aircraft launch2011-05-09: First Ford components delivered2011-06-01: First T-45C launch2011-11-18: First F-35C EMALS launch2015-06-05: First Ford shipboard deadload tests2017-07-24: External-tank launch software fix validated2017-07-28: First aircraft launch from Ford at sea2021-07-12: Kennedy and Enterprise delivery progress disclosed2022-06-25: Ford reaches 10,000 launches and recoveries2023-06-07: Doris Miller launch/recovery production contracted2023-06-08: Enterprise production reported near completion2024-01-17: Ford returns from eight-month deployment2024-02-14: Kennedy first shipboard deadload launch tests2026-08-13: Presidential memorandum directs CVN-81 conversion planning2026-09-23: Continued EMALS procurement reported2032: Original CVN-81 support horizon
test or operationalannouncement, contract, delivery, funding, agreement, terminationpublicationplanned or proposed

Event mix

Test 9Operational 1Publication 5Announcement 1Contract 2Delivery 1Planned 1

The public record is mostly publications and announcements. Tests are the minority in almost every program.

Reported energy

0.11 MJ10 MJ33 MJ record0.11 MJ10 MJ33 MJ record

No energy figure in the reviewed sources. Stored, charging and muzzle energy are different quantities and are never merged. The 33 MJ reference is the Dahlgren record shot of 10 December 2010.

Endurance disclosure

Not applicable

This is an aircraft catapult or a proposed one, so a conductive railgun bore-life metric doesn't apply.

Dated record 20 events · event date shown, not report date

  1. ContractGeneral Atomics selected for EMALS SDD

    NAVAIR announced a $145,621,824 development and demonstration contract for a full-scale Lakehurst system.

    primary evidence
  2. TestPhase-one high-cycle testing reaches 10,000

    Tupelo test program completed 10,000 simulated launch cycles.

    Simulated cycles; no inference about a single component lasting 10,000 aircraft launches.

    primary evidence
  3. PublicationSecond high-cycle test phase reported underway

    NAVAIR announced full power-train and environmental qualification testing.

    primary evidence
  4. TestLakehurst full-scale demonstration ceremony

    Carrier-representative EMALS armature operated at the test-site ribbon cutting.

    primary evidence
  5. TestFirst EMALS aircraft launch

    An F/A-18E launched from the Lakehurst test installation.

    primary evidence
  6. DeliveryFirst Ford components delivered

    PMA-251 delivered the first EMALS components for CVN-78 installation.

    primary evidence
  7. TestFirst T-45C launch

    Aircraft compatibility testing added the T-45C at Lakehurst.

    primary evidence
  8. TestFirst F-35C EMALS launch

    NAVAIR later identified this date for the initial F-35C test launch.

    primary evidence
  9. TestFirst Ford shipboard deadload tests

    NAVAIR photo release describes two successful launches on the initial test day.

    This is the event date given in the June 9 source. It doesn't cover later firsts for individual catapults.

    primary evidence
  10. PublicationExternal-tank launch software fix validated

    NAVAIR reported successful testing of a software remedy for launch-load concerns.

    Publication date; actual campaign completion reported as earlier that summer.

    primary evidence
  11. TestFirst aircraft launch from Ford at sea

    First shipboard aircraft launch/recovery using the new launch and recovery systems.

    primary evidence
  12. PublicationKennedy and Enterprise delivery progress disclosed

    GA reported combined EMALS/AAG equipment delivery of 97% for Kennedy and more than 25% for Enterprise.

    primary evidence
  13. TestFord reaches 10,000 launches and recoveries

    NAVAIR recorded the cumulative aircraft-launch/recovery milestone.

    primary evidence
  14. ContractDoris Miller launch/recovery production contracted

    Navy awarded $1.204 billion modification covering EMALS and AAG for CVN-81.

    primary evidence
  15. PublicationEnterprise production reported near completion

    NAVAIR status report placed Enterprise EMALS/AAG system production near completion.

    primary evidence
  16. OperationalFord returns from eight-month deployment

    Operational deployment concluded with return to Norfolk.

    primary evidence
  17. TestKennedy first shipboard deadload launch tests

    Test team began EMALS deadload launches at Newport News.

    primary evidence
  18. AnnouncementPresidential memorandum directs CVN-81 conversion planning

    Section 2 requested a plan within 60 days for replacement of EMALS with steam catapults in CVN-81 construction.

    Directive issued; replacement remains prospective. No fleet-wide EMALS termination established.

    primary evidence
  19. PublicationContinued EMALS procurement reported

    Navy Times described new support procurement and a component sources-sought notice.

    This doesn't prove the CVN-81 memorandum was reversed.

    secondary evidence
  20. PlannedOriginal CVN-81 support horizon

    June 2023 contract announcement planned installation and certification support through 2032.

    Historical contract horizon; August 2026 policy creates uncertainty.

    primary evidence

Sources 20