France PA-NG / France Libre EMALS integration

PANG EMALS · PA Ng EMALS · France Libre catapults

French adoption of US EMALS for the next carrier, with a publicly reported Rafale compatibility campaign at Lakehurst.

TechnologyElectromagnetic catapult
ScopeAdjacent
EnergyNot published
Endurance disclosureNot applicable
Dated events8 · 2021 to 2026
EvidenceHigh confidencereviewed 2026-09-25

Initial 2021 authorization was for two launchers; a third-track plan appears in later budgeting. Service entry in 2038 remains a plan. The separate sovereign feasibility study is CAT-P15.

Lakehurst, New JerseyLocality-level placement from the stated site · 40.03, -74.35

Dated record on a timeline

2025203020352021-12-21: US approves possible French EMALS/AAG sale2022-09-02: French configuration evaluation contract announced2023: Requirements review scheduled2025-05-21: Rafale compatibility campaign disclosed2025-10-23: Third EMALS track funding plan reported2026-03-25: DGA confirms US compatibility campaign2026-08-17: France affirms continued EMALS supply confidence2038: Planned French carrier replacement horizon2025203020352021-12-21: US approves possible French EMALS/AAG sale2022-09-02: French configuration evaluation contract announced2023: Requirements review scheduled2025-05-21: Rafale compatibility campaign disclosed2025-10-23: Third EMALS track funding plan reported2026-03-25: DGA confirms US compatibility campaign2026-08-17: France affirms continued EMALS supply confidence2038: Planned French carrier replacement horizon
test or operationalannouncement, contract, delivery, funding, agreement, terminationpublicationplanned or proposed

Event mix

Publication 3Announcement 2Contract 1Planned 2

The public record is mostly publications and announcements. Tests are the minority in almost every program.

Reported energy

0.11 MJ10 MJ33 MJ record0.11 MJ10 MJ33 MJ record

No energy figure in the reviewed sources. Stored, charging and muzzle energy are different quantities and are never merged. The 33 MJ reference is the Dahlgren record shot of 10 December 2010.

Endurance disclosure

Not applicable

This is an aircraft catapult or a proposed one, so a conductive railgun bore-life metric doesn't apply.

Dated record 8 events · event date shown, not report date

  1. AnnouncementUS approves possible French EMALS/AAG sale

    DSCA notified Congress of a possible package up to $1.321 billion with two EMALS launchers.

    The approval authorizes a possible sale. Delivery needs separate confirmation.

    primary evidence
  2. ContractFrench configuration evaluation contract announced

    GA announced additional PA-NG integration and configuration evaluation work.

    Announcement date; award day unspecified.

    primary evidence
  3. PlannedRequirements review scheduled

    2022 contract statement expected a system requirements review during 2023.

    Completion not confirmed in reviewed evidence.

    primary evidence
  4. AnnouncementRafale compatibility campaign disclosed

    French program officer said at CNE that a Lakehurst test campaign had recently begun.

    Disclosure date; individual test dates not published in source.

    secondary evidence
  5. PublicationThird EMALS track funding plan reported

    Naval News reported proposed 2026-budget provision for a third track.

    Draft-budget report; final contract configuration needs procurement confirmation.

    secondary evidence
  6. PublicationDGA confirms US compatibility campaign

    DGA publication states Rafale compatibility with EMALS/AAG was tested in the United States.

    Indexed excerpt; detailed results not retrieved.

    primary evidence
  7. PublicationFrance affirms continued EMALS supply confidence

    Media report relays ministry assurance following the US CVN-81 policy change.

    secondary evidence
  8. PlannedPlanned French carrier replacement horizon

    Contemporary reporting places France Libre service entry around 2038.

    This is a scheduled future date, and operational capability hasn't been established yet.

    secondary evidence