Tracker · Programs · United States
United States · Coilgun · historical

Mass Driver III

Mass-Driver Three · Mass Driver 3

Third demonstrator tested a self-centering mass-driver arrangement and achieved further acceleration milestones.

TechnologyCoilgun
ScopeHistorical
EnergyNot published
Endurance disclosureNot applicable
Dated events4 · 1982 to 1984
EvidenceHigh confidencereviewed 2026-09-25

An undated SSI report describes later performance. No date has been inferred for that later result.

Princeton, New JerseyLocality-level placement from the stated site · 40.34, -74.66

Dated record on a timeline

19801981198219831984198519861982: Third demonstrator construction begins1983: Mass Driver III initial milestone1984: Further Mass Driver III progress19801981198219831984198519861982: Third demonstrator construction begins1983: Mass Driver III initial milestone1984: Further Mass Driver III progress
test or operationalannouncement, contract, delivery, funding, agreement, terminationpublicationplanned or proposed

Event mix

Test 2Publication 1Announcement 1

The public record is mostly publications and announcements. Tests are the minority in almost every program.

Reported energy

0.11 MJ10 MJ33 MJ record0.11 MJ10 MJ33 MJ record

No energy figure in the reviewed sources. Stored, charging and muzzle energy are different quantities and are never merged. The 33 MJ reference is the Dahlgren record shot of 10 December 2010.

Endurance disclosure

Not applicable

The rail-life metric doesn't apply to this non-rail electromagnetic launcher.

Dated record 4 events · event date shown, not report date

  1. AnnouncementThird demonstrator construction begins

    Construction began at Princeton.

    primary evidence
  2. TestMass Driver III initial milestone

    SSI records successful testing above earlier demonstrated accelerations.

    primary evidence
  3. TestFurther Mass Driver III progress

    SSI chronology records another acceleration milestone.

    primary evidence
  4. PublicationLater performance summarized

    Undated SSI report describes performance exceeding earlier milestones.

    primary evidence

Sources 2

Record CH-P06. A working source link does not mean that every statement on the linked page is accurate. Each source is cited only for the claim it supports. Reviewed 2026-09-25.