Electrophysics Problems Institute hybrid ET / railgun research
Hybrid launcher research combined an electrothermal first stage with a railgun stage.
The planned larger facility isn't known to have been commissioned. Not all experiments in this program used an electromagnetic acceleration stage.
Dated record on a timeline
Event mix
The public record is mostly publications and announcements. Tests are the minority in almost every program.
Reported energy
20 MJ planned facility · Basis: Electrical storage; facility described as being assembled in 1993. Stored, charging and muzzle energy are different quantities and are never merged. The 33 MJ reference is the Dahlgren record shot of 10 December 2010.
Endurance disclosure
Not published in reviewed sources
No quantified rail service life found in the reviewed sources.
Dated record 1 event · event date shown, not report date
- PublicationHybrid experiments and larger facility described
FASAC cites 1993 reports on hybrid experiments and a 20 MJ facility under assembly.
The construction description isn't evidence of completed commissioning.
mixed evidence
Sources 1
- Non-US Electrodynamic Launchers Research and DevelopmentForeign Applied Sciences Assessment Center, Los Alamos National Laboratory; DOE OSTI archive · 1994-11 · historical
Record AUD-P08. A working source link does not mean that every statement on the linked page is accurate. Each source is cited only for the claim it supports. Reviewed 2026-09-25.