Army 9 MJ Range Gun System

9 MJ Range Gun · EARC 90 mm railgun

Launcher completed at UT-CEM in December 1993 and installed at Picatinny in January 1994 for tests.

TechnologyRailgun
ScopeHistorical
Energy9 MJ system classnominal muzzle energy
Endurance disclosureNot published in reviewed sources
Dated events3 · 1993 to 1994
EvidenceMedium confidencereviewed 2026-09-25

The 52 MJ supply rating refers to stored electrical energy. A later paper appeared in 1997; the dates of continued testing are unverified.

Austin, TexasLocality-level placement from the stated site · 30.39, -97.73

Dated record on a timeline

199319941995199619971993-12: Range Gun launcher construction complete1994-01: Range Gun installed at Picatinny1997-01: Range Gun commissioning paper published199319941995199619971993-12: Range Gun launcher construction complete1994-01: Range Gun installed at Picatinny1997-01: Range Gun commissioning paper published
test or operationalannouncement, contract, delivery, funding, agreement, terminationpublicationplanned or proposed

Event mix

Publication 1Delivery 2

The public record is mostly publications and announcements. Tests are the minority in almost every program.

Reported energy

0.11 MJ10 MJ33 MJ record9 MJ0.11 MJ10 MJ33 MJ record9 MJ

9 MJ system class · Basis: nominal muzzle energy. Stored, charging and muzzle energy are different quantities and are never merged. The 33 MJ reference is the Dahlgren record shot of 10 December 2010.

Endurance disclosure

Not published in reviewed sources

No quantified endurance result in reviewed abstract.

Dated record 3 events · event date shown, not report date

  1. DeliveryRange Gun launcher construction complete

    UT-CEM finished the launcher.

    primary evidence
  2. DeliveryRange Gun installed at Picatinny

    Launcher delivered to EARC for testing.

    primary evidence
  3. PublicationRange Gun commissioning paper published

    Journal paper records the 1993-1994 construction and installation sequence.

    primary evidence

Sources 1

Record US-P13. A working source link does not mean that every statement on the linked page is accurate. Each source is cited only for the claim it supports. Reviewed 2026-09-25.